Buildings 4 & 5 Demolition & Soil Excavation – ABC Facility

Lockheed Martin believed that Buildings 4 & 5 at the former ABC site, and the soil there, impacted the groundwater in the vicinity of former sumps. Explore the work plans that detail the demolition of these buildings and the removal of the affected soil there.

Buildings 4&5 Demolition Plan 
March 28, 2008

Air Monitoring Plan for Proposed Demolition Activities 
March 17, 2008

Interim Remedial Measure Work Plan 
March 5, 2008